
We finally poured the concrete footer! It's taken forever because of all the rain we had last month, but on April 30th - Brent and I got the concrete in.
He also finished the frame for our new highway sign. I'm designing it and I wanted to get everyone's opinion on it. I'm attaching below, what I think, may be the final proof. What do you think?

2 comments:
Congrats on getting the concrete poured! The sign design looks GREAT!
that sign is "spank" great. I thought that was the most appropriate adjective. :)
Post a Comment